Construction of Energy School – Kindergarten Class A
In 2020, with a completion time of just 30 days, we delivered the construction of an Energy School – Kindergarten Class A, in the area of Perama.
The project was completed with absolute consistency in both delivery time and original design. The construction follows all the specifications, with the Thermo and Thermo Facade system.
Materials:
During the construction were used:
- Knauf plasterboard and materials
- Rothoblaas fasteners and screws
- Valsir collector
- Hagen and Legrand electrics
Interior:
The interior space consists of two rooms with a capacity of 30 people / each, toilets and teachers’ offices – administration.
The colors and the decoration have been edited to give a calm and pleasant atmosphere, which is necessary for the children to stay in the space.
Guided by humans and especially children, the static ability and solidity was absolutely ensured without losing the aesthetic harmony that is so important in general and especially in the daily life of children.